A 200 MW, 800 MWh battery storage system in Lazio, with a compact configuration and landscape and environmental mitigation measures.
BESSLFPLandscape mitigation
Project profile
Status
Awaiting the outcome of the Single Authorisation
Location
Lazio
Phase
Single Authorisation
The project
The BESS project was developed to combine high electrical efficiency with optimised land use through a compact, rational equipment layout.
Particular attention was given to integrating the project into its landscape and environmental setting, with substantial mitigation and compensation measures.
Storage duration
4 hours
Configuration
Groups of 4 battery containers of 20 feet and 1 PCS
Batteries
Lithium iron phosphate (LFP)
Grid connection
220 kV connection
Connection design
Awaiting approval
Territorial reading
An extensive perimeter woodland is planned to integrate the facility into its surroundings and provide complete visual screening once established.