Contact

BESS

BESS Campitello

A 200 MW, 800 MWh battery storage system in Lazio, with a compact configuration and landscape and environmental mitigation measures.

BESSLFPLandscape mitigation

Project profile

Status
Awaiting the outcome of the Single Authorisation
Location
Lazio
Phase
Single Authorisation

The project

The BESS project was developed to combine high electrical efficiency with optimised land use through a compact, rational equipment layout.

Particular attention was given to integrating the project into its landscape and environmental setting, with substantial mitigation and compensation measures.

Storage duration
4 hours
Configuration
Groups of 4 battery containers of 20 feet and 1 PCS
Batteries
Lithium iron phosphate (LFP)
Grid connection
220 kV connection
Connection design
Awaiting approval

Territorial reading

An extensive perimeter woodland is planned to integrate the facility into its surroundings and provide complete visual screening once established.

Project renderings

Project rendering of BESS Campitello
Project rendering
Second project view of BESS Campitello
Project rendering — second view

Learn more about the project